. SAATTE 1 TON KAPASİTELİ MAKARNA KURUTMA MAKİNASI TESİSİ ( 999.000 ) €+KDV

            

. SAATTE 1 TON KAPASİTELİ MAKARNA KURUTMA MAKİNASI TESİSİ ( 999.000 ) €+KDV
Akalma: İRAN
The Offer of HMX 1000 Compact Short Cut Pasta Drying System you would like to plan for
investment and offered from us contains the documented following unit. We hope that the offer will be
accepted and waiting for your valuable orders.
Best Regards
Tarih / Date : 12/09/2019
Teklif / Offer No: 01001
Last Validity : 15.10.2019
2
Shaking Pre-Dryer; 3 layers shaking system.
- Base support structure coated steel structure with epoxy paint.
- 3 layer as shaking
- 5 pcs axial fans.
- Superheated hot water coil
- Support structure for cabin panels made of stainless steel profiles
- Cabin mesh is made of 304 Stainless Steel Mesh
- Cabin panels made of Aisi 304 Stainless Steel, Injected inside high density PU isolation
- Air temperature control with gauge and globe valve.
Elevator:
- 1. from shaker (trabatto) to dryer
- Coated heavy-duty steel construction, feed leg section, angle section, discharge head unit: gear motor chain
drive system for buckets with automatic power factor correction of the joint as available for tension
calibration by the user.
- Stainless steel bucket protections.
- Plastic buckets width 350 mm.
- Gear Boxes are made in Turkey.
ECO DRYER; continous system.,
All construction is Stainless Steel,
- Dryer construction is completely Aisi 304 L
- Pasta loading distributor – equipped with vibratory tier driven by no. 2 vibratory motors – the tier is made
of stainless steel Aisi 304 L sealed sheeting, carrier construction is metal covered by epoxy paint, heated by
means of coils positioned underneath the vibratory tier with pre-heated inlet, by means of heating element.
- Gear Boxes are YILMAZ or other made in Turkey.
- Electric motors are special isolated motors as made in TURKEY.
3
- Chain support guide for metallic belt drive - made of stainless steel Aisi 304 L
- Gear motor equipped with automatic power factor correction by inverter system.
- Chains and star-shaped toothed gears
- Slotted metal belt system – composed of articulated slotted slats made of anodised aluminum, inside it
there is Aisi 304 mesh for better air circulation.
- Belt motion/advancement by means of oiled chains – belts fastened with Aisi 304 SS rivets
- Pasta overflow side guards made of Aisi 304 L Stainless steel positioned on each tier.
- Cabin panels high isolation levels 63 mm thickness, made of flame retardant high density polyurethane
lined on the inside with stainless Aisi 304 sheeting with hard-soldered borders which require openings or
holes. Side panels can be opened for inspection and are equipped with guide devices and specific strap
covers.
- There is internal lighting special isolated for high moisture and temperature, made in Turkey
- Central vibratory discharge pan – equipped with vibratory tier driven by no. 2 vibratory motors and heated
side guards by means of a heating element by air elements.
- Vibratory AC motors are OMB Srl. Made in ITALY.
- In drying zones vertical axial fans are MULTIWING made in Denmark.
- Air ducts – made of Aisi 304 stainless steel ducts, positioned inside the belt.
- Stabilization composed of metal sheets positioned in such a way that the return air flow is directed to the
upper tiers of the dryer without being heated.
- Pre-heated air intake device – for the drying zone, fed by a centrifuge, with butterfly valve connected to the
air extraction valve.
- Centrifuge blowers trade mark as made in TURKEY.
- Set of pneumatic/electronic temperature control materials – complete with Ordel Moisture and
Temperature control probes.
4
Cooler Unit (2 x 1);
Moving with vibro system, cooling with air circulation and the air which passed from cold water serpentines
by axial fans as one layer.
- Support base and complete construction made by Aisi 304 Stainless Steel
- Cabin panels high isolation levels 63 mm thickness, made of flame retardant high density polyurethane
lined on the inside with stainless Aisi 304 sheeting with hard-soldered borders which require openings or
holes. Side panels can be opened for inspection and cleaning
- Slotted metal belt system – composed of articulated slotted slats made of anodized aluminum, inside it
there is Aisi 304 mesh for better air circulation.
- Cooling coil copper piping and aluminum fins.
- Cooling unit Air circulation fan feeding cooling coil.
Climate Units
- Super heated and cold waters controls by 3 way percentage
control by PID system.
- All manual thermometers are PAKKENS made in Turkey.
- Water circulation pumps are KSB, GERMANY
- Globe valves with mechanical seal in all super-heated water
system is BONETTI, ITALY-TURKEY.
Bearings
- All Bearings SKF or FAG and some Japanese and Turkish
special type bearings,
- Made in GERMANY or Made in JAPAN or TURKEY
Cabeling,
- All outside cables are TSE standart, made in Turkey
- All inside cables are TSE standart, red Silicon covered cables, made in Turkey.
5
Automation;
The systems in production line are controlled by PLC; System is operated with special software designed
graphic supported on PC with Graphic human interface system. You can make the control from direct or
from internet connection from outside. Also you can see every think easily from schematic view on
computer. And there is a buzzer system on panel for faults.
Historical archive memory storage
From the production records stored, it is possible to retrieve and visualize all the main variables, list of
alarms and operator’s adjustments carried out on the PC over the last 12 months.
For historical archives, all files generated, which go back further than 12 months, can be saved directly on
the PC or on the Client’s server.
6
GENERAL CONDITIONS
1. INSTALLATION ( ASSEMBLING)
Installation will be done qualified 5 technicians from The buyer will guarantee the availability
of the following personnel: 2 professional plumber which can make water line welding for boiler and chiller
lines, 1 assistant mechanic workers as helper.(the whole persons for supporting expenses, insurance, catering
costs, hosting costs (if needed) belong to the buyer. During the assembling consuming materials, tools and
machines etc. technical and non technical workers to buyer.
All the technicians have to stay minimum 4 star hotel and it must be clean and safe foods can be
from international food chains. Total Erection (Installation) time is 35 work days from arrival of all materials
and equipments in the erection site which must be ready for assembly work and pipe welding person must be
ready (with all). Hemaks personel’s flight (total 6 pcs double way flight ticket), hotel and food costs are to
Buyer. Buyer will pay to each Technician 150 USD per Week as pocket money.
Required labor assistance, civil works, plants and equipments excluded from our supply.
Note: If these overall one-man working days planned for erection shall be prolonged by more than 7 days
due to buyer’s fault, then the exceeding days shall be charged to the buyer at the average daily rate of USD
300,-.
Assembling, last supervising, starting and test production is included in price. All masonry works, means
of transportation and hoisting such as cranes, lifters, etc. will be at the Customer’s expense. Main electric
transformer and regulator in plant building at customer charge.
2. START-UP OF THE MACHINE
After installation, technicians from will hand over to the buyer. The machine will be tested with
the persons working on the machine. Raw material needed first working must be arranged by the buyer. The
start-up of the machine and test production will take 5 work days.
Before the Test production starts; fresh pasta, hot water, electric and workers for all shifts must be arranged
by the buyer as enough for 5 days capacity. If there was delay because of the missing from these materials
the cost of delay will be charged to the buyer.
3. EXCLUSIONS
The Buyer should also arrange for the freight, bringing down, forklift, implements (like welding machine)
during the all installation period.
Main electric transformer and regulator in plant building at customer charge. From Main electric transformer
to control panels electric caballing is to Buyer. From Main water supply to the entrance of the water
treatment unit is to buyer. Feeding the fresh pasta to the drying system entrance.
7
4. GUARANTEE
Our machine’s all mechanic parts are covered with our guarantee for 2 years, all electrical parts are
covered with our guarantee for 2 years. We are giving 10 years spare parts supply guarantee for mechanic
parts. Defective parts will be replaced under guarantee on ex-our Gaziantep, Turkey workshops basis.
The faults of user and unbalanced electric damages from the transformer are not covered for warranty.
Inserts of the dies do not have any guarantee.The period of warranty begins at the date of invoice.
In the needed conditions because of a technical argument or supply argument have the right to
change the materials or the trade mark of the materials used in the machine with the same guarantee of

PRODUCTION GUARANTEES
Nominal capacity: 1000 kg/h.
Short-cut pasta reference shape: “bucato” shape with specific weight of 400 kg/m3 and wall thickness 1mm
dry product;
Final product moisture content: 12.0% ± 0.5
Production capacity measured at the outlet of the cooler;
Continuous production cycle: 24 hrs a day.
8
1. SALES CONDITIONS
No Description Amount
1 Short cut pasta Dryer, 1000 kg/H as Full Automatic 1 SET 440.000
2 Short cut pasta Shaking pre-dryer (trabatto), 1000 kg/H capacity 1 SET 21.000
3 Installation, Stat-up and training 1 SET 10.000
4 Cooler Unit on the end of dryer 1000 kg/H capacity 1 SET 15.000
5 Dryer feeding elevator 1000 kg/H capacity 1 SET 11.000
GRAND TOTAL (EXW) EURO 497.000,-
PAYMENT:
1. 30% by T/T as advance in order
2. 70% by T/T on shipping
SHIPMENT
METHOD: EXW GAZIANTEP/TURKEY
TIME : 6 months after advance payment. (This date can change according to date of certain order)
NEEDED CONTAINERS: 4 PCS CONTAINER AS 40’ HC OR 4 PCS TRUCKS
OUR BANK ACCOUNT DETAILS ARE BELOW;
OUR COMPANY NAME:
Anahtar Kelimeler:  
Tarih: 25.09.2019 09:29
Beenilme: 5769
ndirilme: 0
zlenme: 0.00 (0 Oylama)
Dosya Boyutu:
Ekleyen: Administrator

Yaynlayan: Yorum:
Bu rnle ilgili yorum bulunamad



   Sonraki rn:
. SAATTE 1 TON KAPASİTELİ MAKARNA KURUTMA MAKİNASI TESİSİ ( 999.000 ) €+KDV

 

    Powered by VisionBilgisayar |  Copyright © 2006 VisionBlg Birwebmaster